This project involved the replacement of the existing highway lighting system on Route I-93, including exit ramps, between Rt95 in Woburn and Roosevelt Circle in Medford. The new highway lighting system included 7 new lighting load centers, 9 – 100ft High mast towers and 6 – 115ft high mast towers with new foundations, 148 new light poles with LED luminaires, 9 Closed Circuit Television Cameras (CCTV) with poles, 32,000 feet of fiber optic cable and over 80,000 feet of new conduit, including bridge crossings and underdeck lighting. Replacement of 2 traffic counting stations.
Related Street Lighting Intelligent Transportation Systems Projects


Rte 2 Highway Lighting
Lighting improvements to the Route 2 Mainline and Ramps beginning in...
View Project


Variable Message Signs & Over Height...
Communication and Electronic Sign System Upgrades and Replacements along Interstates 90...
View Project


MassDOT Real Time Traffic Monitoring (RTTM)...
Project consisted of the initial installation of a Real Time Traffic...
View Project


Massport Tunnel Lighting
This project includes removal and replacement of existing tunnel luminaires with...
View Project


MassDOT Camera Stations
This project includes furnishing and installing Intelligent Transportation Systems (ITS) field-equipment...
View Project