Lighting improvements to the Route 2 Mainline and Ramps beginning in Cambridge at Alewife Brook Parkway and ending in Lexington. The project includes, 4 new lighting load centers, 3 high mast towers with new foundations, installation of 211 new light poles with LED luminaries, over 60 rock sockets drilled into ledge for foundation installation, 4 Closed Circuit Television Cameras (CCTV), directional drilling under the highway, over 50,000 feet of new conduit, and new concrete median barrier.
Related Street Lighting Intelligent Transportation Systems Rock Sockets Projects


Rte 93 Highway Lighting
This project involved the replacement of the existing highway lighting system...
View Project


Variable Message Signs & Over Height...
Communication and Electronic Sign System Upgrades and Replacements along Interstates 90...
View Project


MassDOT Real Time Traffic Monitoring (RTTM)...
Project consisted of the initial installation of a Real Time Traffic...
View Project


Massport Tunnel Lighting
This project includes removal and replacement of existing tunnel luminaires with...
View Project


MassDOT Camera Stations
This project includes furnishing and installing Intelligent Transportation Systems (ITS) field-equipment...
View Project